The Aras Innovator software is used for product lifecycle management (PLM), advanced product quality planning (APQP), lean product development, and new product introduction (NPI). Aras switched to an open source model in 2007, where clients obtain the software for free, and Aras Corp provides technical support, software updates, and other consulting as a subscription service.
N/A
SAP Integrated Product Development
Score 9.5 out of 10
N/A
SAP Integrated Product Development is a product lifecycle management solution used to define, develop, and deliver innovative and sustainable products faster by connecting insights, processes, and people.
Aras PLM works for our company, yet I don't have experience with any other software system. The system does not refresh and update quickly. Often times users need to force a refresh or logout and logon to verify changes and updates. The Lock and Unlock feature needs getting used to.
SAP PLM is suited for big organizations with no economic constraint since the price of SAP PLM is high. But it makes developing and maintaining applications easier through it change management and status management process. SAP PLM is suited in organizations with high skilled workers because it is complex to handle.
Aras PLM uses terms and labels that can be confusing like Subsystem / Subsystem Version, Project Record Number (PRN). Companies need to understand these terms and develop business processes to set user standards.
I personally use Aras PLM to manage information technology project documents. In my opinion, Aras PLM is more geared to product and engineering. I would like to see a general project management Aras PLM version with terms and labels that I am familiar with.
The description field should be made required. Many of our engineers have created records and left that blank because it was not required. This would help with the context or background of each record.
Our company is moving from repositories like IBM Notes, MS Sharepoint, and plain network file share directories to a more controlled system of recordd like Aras PLM.
Our company developed numerous IBM Lotus Notes databases to perform document control. Aras PLM is the better choice to IBM Notes databases and home grown databases.
SAP PLM encompasses SAP BW and SAP PRD. We tend to focus more on the SAP PRD portion as it directly involves more closely to production. We selected SAP PLM because it gives us a great visibility in the life cycle of materials, products and overall costs. SAP PLM compliments the other packages very well
Accurately able to order raw materials which are necessary for the current production run, thus reducing overhead.
The negative impact would be the initial cost of the software and how long it would take to ROI that cost.
It has allowed us to control batches of product creation much more closer and have the ability to cut some erroneous costs which were found in large batches.