Autodesk Build vs. Oracle Primavera Portfolio Management

Overview
ProductRatingMost Used ByProduct SummaryStarting Price
Autodesk Build
Score 8.1 out of 10
N/A
Autodesk Build, based on the former PlanGrid, is construction productivity software. It includes tools to collaborate, collect, and manage project information throughout the project’s construction and operations lifespan. It enables document centralization and tracking.
$39
user per month
Oracle Primavera
Score 7.7 out of 10
N/A
Oracle’s Primavera is a software suite designed for construction and other asset-intensive industries. It contains a variety of project planning, management, and execution components for buyers to select from.N/A
Pricing
Autodesk BuildOracle Primavera Portfolio Management
Editions & Modules
Nailgun
$39
user per month
Dozer
$59
user per month
Crane
$139
user per month
No answers on this topic
Offerings
Pricing Offerings
Autodesk BuildOracle Primavera
Free Trial
YesNo
Free/Freemium Version
NoNo
Premium Consulting/Integration Services
NoNo
Entry-level Setup FeeNo setup feeNo setup fee
Additional Details
More Pricing Information
Community Pulse
Autodesk BuildOracle Primavera Portfolio Management
Features
Autodesk BuildOracle Primavera Portfolio Management
Construction Project & Field Management
Comparison of Construction Project & Field Management features of Product A and Product B
Autodesk Build
6.5
Ratings
15% below category average
Oracle Primavera Portfolio Management
-
Ratings
Plan distribution & viewing7.00 Ratings00 Ratings
Plan markups & sharing6.00 Ratings00 Ratings
Issue tracking & punchlists5.00 Ratings00 Ratings
Photo documentation9.00 Ratings00 Ratings
Jobsite reports9.00 Ratings00 Ratings
Document sharing8.00 Ratings00 Ratings
RFI tools5.00 Ratings00 Ratings
Collaboration & approvals8.00 Ratings00 Ratings
As-built drawings5.00 Ratings00 Ratings
Mobile app3.00 Ratings00 Ratings
Best Alternatives
Autodesk BuildOracle Primavera Portfolio Management
Small Businesses
FollowUp CRM
FollowUp CRM
Score 10.0 out of 10
monday.com
monday.com
Score 8.6 out of 10
Medium-sized Companies
InEight
InEight
Score 8.3 out of 10
Planview PPM Pro
Planview PPM Pro
Score 9.0 out of 10
Enterprises
InEight
InEight
Score 8.3 out of 10
Planview PPM Pro
Planview PPM Pro
Score 9.0 out of 10
All AlternativesView all alternativesView all alternatives
User Ratings
Autodesk BuildOracle Primavera Portfolio Management
Likelihood to Recommend
7.0
(0 ratings)
8.0
(0 ratings)
Likelihood to Renew
10.0
(0 ratings)
-
(0 ratings)
Usability
5.0
(0 ratings)
8.0
(0 ratings)
Support Rating
9.0
(0 ratings)
-
(0 ratings)
User Testimonials
Autodesk BuildOracle Primavera Portfolio Management
Likelihood to Recommend
Plangrid is well suited for companies (that are not currently using a different SaaS construction package) to make their construction document management more collaborative and mobile friendly. Companies requiring/wanting their subs and owners to collaborate with them as part of the life of a construction project will find Plangrid very helpful in fulfilling this goal. On the negative side, companies that are fully entrenched in using other construction suites will struggle to fully use Plangrid to its potential as pre-built integration between Plangrid and other packages is limited
Read full review
This program is well suited for online database management for construction-related fields and their contract management. It has many features which allow for reporting, issuance of changes, applications for payment and HB, and related construction-related documentation for both client and user. It also allows one to print and review in PDF any required documentation needed as per contracts.
Read full review
Pros
  • Very easy to use, and training takes less than a few hours for field staff.
  • Connects office to field quickly and efficiently.
  • Uploading , naming, and tagging sheet is the best in the business.
  • Sheet and document manager always display most current information and also gives you the ability to look back at previous versions for changes.
Read full review
  • Critical Path Methodology will identify potential issues in on time completion if activities move.
  • A resources loaded schedule can accurately forecast % complete and staffing requirements.
  • Coding allows easy group, sort, and filtering when reporting to certain business units out of the same file.
Read full review
Cons
  • It'd be nice to have access to upload and edit documents from the app. Only for certain users.
  • A small business billing option that addresses multiple users of a single account would make managing access simpler. Being able to load unlimited sheets, but only access a specific limit on your team's devices.
  • Allow users to integrate their own RFI templates into the app, so RFIs can be generated in your own format right from the field, immediately ready to ship.
Read full review
  • The software is high end with rich features, hence its rich price.
  • There is room for improvement in their customer service.
  • Oracle is doing its best in coming up with new features, and has a planned roadmap. It would be good if the enhancements are delivered faster.
Read full review
Likelihood to Renew
We are at the point where we have shown our teams what is possible with this software. We cannot take it away and go back to the way we used to do things. I think that they would push back on us to give them access to something electronic. It is a good program that we will continue to use
Read full review
No answers on this topic
Usability
Hard to get the hang of this software, but with time it become very repetitive and easier to navigate. I have used this software for over a year now and the constant updates by Autodesk have made the software better and better to use at work. This allows me to use this tool more effectively
Read full review
Is easy to use but the the interface should be more nice and contemporary
Read full review
Support Rating
Online chat during business hours is extremely helpful. The Plangrid staff has gone above and beyond many times to help us. One time they even offered to completely rebuild our 900+ sheet project so I could slip sheet a few old drawing revisions! This undoubtedly would have taken hours on Plangrid's end. They are always responsive and are continually improving, listening to user feedback.
Read full review
No answers on this topic
Alternatives Considered
Procore and PlanGrid are the most direct competitors. The pricing structures are very dynamically different between PlanGrid and Procore. Procore tends to succeed better in the "project management" realm, while PlanGrid succeeds far beyond Procore in its ability to deal with project documentation (plans and specs). Bim360 is a great product, but it is limited in its use due to the modeling requirement; while PlanGrid bridges that gap and plays in both 2D and 3D spaces. Buildertrend has some aspects of plan distribution, but it is limited in functionality.
Read full review
I did not select Oracle Primavera Portfolio Management. It was an inherent application. Having used other applications, compared to those, Oracle Primavera Portfolio Management is a far superior tool for portfolio management. However, in the span of the last 10 years, there are newer, perhaps better products available. Oracle Primavera Portfolio Management does still manage to get the job done, but its time in the sun is fading.
Read full review
Return on Investment
  • Positive: Syncing drawings. As I said, keeping an up-to-date set of drawings is seamless on ProCore, as compared to a traditional server or even the cloud. The software is designed to see and mark-up drawings. Though markup tools aren't as robust as, say, Bluebeam Revu (I wouldn't expect all of that from a web app, anyway), it's very nice to easily see all the newest drawings.
  • Positive: Saved time. Documents are updated at the same time, across all devices, with only one upload.
  • Positive: Punch list is easy. ProCore punch lists are quite complicated. In PlanGrid, with 1-tap we can add items and give a brief description. When doing a walk-thru, it should be easy to jot down notes. These can be detailed once you're sitting at a desk, and PlanGrid allows for that. But for field personnel, punch lists are an easy and efficient use of time.
  • Negative: Photo management. For us, there should be a way to just upload photos, and not require to use the photo tool within the app.
Read full review
  • P6 has had measurable ROI in the fact that projects can be completed on schedule or sooner using it.
  • P6 it presents data date stamps, which are used to share with clients during the project for the progress of the schedule.
  • P6 may have a high level of entry to use for the smaller project, which can be a hindrance to use.
Read full review
ScreenShots

Autodesk Build Screenshots

Screenshot of No confusing folders - all your plans at your fingertips.Screenshot of Easy overlay to visually detect changes or clashes.Screenshot of Track issues directly on the plan, including descriptions, photos, cost, and schedule impacts.Screenshot of Mark up plans for instant communication between field and office.Screenshot of Attach any kind of construction documents to your plans, including 360 photos.Screenshot of Track, review, and submit all your field reports on a mobile device.